Техническая документация
Характеристики
Brand
EntrelecЦвет
Зеленый, желтый
Количество уровней
Одинарный
Серия
ZK10
Метод оконцовки
Пружинный зажим
CSA кабеля
10мм²
Минимальная рабочая температура
-55°C
Максимальная рабочая температура
+110°C
Страна происхождения
France
Информация о товаре
ZK10 PI-Spring Feed-Through Terminal Blocks
ZK10 PI-Spring feed-through Terminal Blocks combine high performance with compact dimensions. The terminals are also the best for marking, with an up-front flat marker zone. This feature lets you mark up to eight digits or increase the font size.
SNK Series PI-Spring Terminal Blocks
PI-Spring technology provides a Smart Connection and the benefits of 2 technologies in 1 connection:
1. 50% faster connection time with Push-In mode (direct insertion - for stranded wire with ferrule or for solid wire, use screwdriver to remove wire).
2. Reduced effort and conductor preparation time with Spring-Mode (use screwdriver to insert and remove non-prepared stranded wires).
Информация о наличии не успела загрузиться
Пожалуйста, перезагрузите страницу (ctrl+F5)
тг 1 568,97
Each (In a Pack of 5) (ex VAT)
5
тг 1 568,97
Each (In a Pack of 5) (ex VAT)
5
Техническая документация
Характеристики
Brand
EntrelecЦвет
Зеленый, желтый
Количество уровней
Одинарный
Серия
ZK10
Метод оконцовки
Пружинный зажим
CSA кабеля
10мм²
Минимальная рабочая температура
-55°C
Максимальная рабочая температура
+110°C
Страна происхождения
France
Информация о товаре
ZK10 PI-Spring Feed-Through Terminal Blocks
ZK10 PI-Spring feed-through Terminal Blocks combine high performance with compact dimensions. The terminals are also the best for marking, with an up-front flat marker zone. This feature lets you mark up to eight digits or increase the font size.
SNK Series PI-Spring Terminal Blocks
PI-Spring technology provides a Smart Connection and the benefits of 2 technologies in 1 connection:
1. 50% faster connection time with Push-In mode (direct insertion - for stranded wire with ferrule or for solid wire, use screwdriver to remove wire).
2. Reduced effort and conductor preparation time with Spring-Mode (use screwdriver to insert and remove non-prepared stranded wires).